CTU and Skidding Equipment
Jack-up Rigs and Semi-submersible rigs have a requirement for an CTU and Skidding Equipment as part of its drilling process. PH Hydraulics offers customized drilling packages and we work with our partners and understand their needs to create a package that can improve their operations.
Description
Conductor Tensioning Platform
- Installed onto a jack-up rig to contain the conductor tensioning unit.
- Allows the conductor tensioning unit panels to skid and fold laterally to perform drilling on either side of the platform.
Conductor Tensioning Unit
- To firmly hold in place a drilling conductor.
- Installed together with CTP.
- Applies an upward tension to the conductor to prevent it from slipping into the sea bed.
Lift and roll skidding design for DES, X-Y skids for Xmas tree
- An electrical driven hydraulic mechanical system to skid the 3000 tons weight cantilever structure from its storage position to its drill position.