PH Hydraulics & Engineering is on schedule to complete the construction at 23 Tuas Road by the 15th June 2016. Once completed, the new yard will have a wharf length of 80 meters with a depth of about 4 meters at high tide.

The facility will have various lifting capacity ranging from a 10 ton Gantry Crane to 100 ton Gantry Crane. A 200 ton A-Frame Crane is the jewel in the crown and this crane is built along-side the wharf to facilitate loading and un-loading.

Test pits have been constructed to test equipment up to 1000 tons and we have embedded frames into the ground to pull any amount of loads from the sea.

We are confident that this facility can serve your needs and we look forward to the completion of our new water front facility.